Improve Jamsil Sports Complex (414,205 ㎡) and its support facilities
- Main stadium, auxiliary stadium, indoor sports complex (indoor gymnasium, swimming pool), baseball park

Build large-scale exhibition and convention facilities, and expand related infrastructure
(commercial and cultural facilities)

Establish a plan to utilize the surrounding area and waterside areas (513,447 ㎡)
by moving Olympic-daero, Tancheondong-ro, and Tancheonseo-ro underground.

Sports complex(Indoor gymnasium + swimming pool) / Main stadium / Baseball park / Auxiliary stadium / Hosting International games - Sports facilities for citizens - A complex of culture and concert facilities
  • Upgrade dilapidated sport facilities, and combine cultural and commercial functions to build an urban sports complex
    • Main Stadium: Preserve the circular stadium (location, central design), a symbolism of the 1988 Olympics, and modernize the stadium for international games.
      • Utilize the seating capacity of 60,000 by combining sports with additional facilities to create synergy, and enhance the usability in general.
    • Auxiliary Stadium: Utilize the stadium as a multi-use stadium, as a track and field training facility, a public sports facility, and as a soccer stadium.
      • With a seating capacity of 2,000, place it adjoining the main stadium.
    • Sports Complex: Transform into a complex for sports and culture, with concert and entertainment facilities.
      • A complex featuring an indoor gymnasium, swimming pool, and concert hall (hosting professional basketball games), with a seating capacity of 11,000
    • Baseball Park: Build in a location offering views of the Hangang River, design for optimal game-viewing experiences, games, and expand convenient facilities for players and audience.
      • Featuring a seating capacity of 35,000 and for-profit facilities, including retail.
MICE Cluster / Seoul exhibition brand I SEOUL EXHIBITION U / MICE supporting facilities
  • Build a hub of international business exchange, leading global competitiveness by building a MICE cluster and creating Seoul exhibition brands
    • Exhibition and Convention: Capitalize on the locational advantage of the center of the city, establish a cluster by linking similar facilities nearby, connect to the global network, and create Seoul exhibition brands.
      • Build large-scale facilities (around 100,000 ㎡) dedicated to exhibitions and conventions in the center of the city.
    • Functions: Build accommodations such as luxury business hotels and youth hostels, and establish for-profit facilities (190,000 ㎡) differentiated from local commercial areas on the basis of pedestrian walkways.
      • MICE linked businesses such as duty free shops and sports category killers are recommended.
    • Program: Establish creative facilities and programs suitable for the characteristics of a MICE Complex and amplify synergy with each facility.
Movig roads undergrounds / Specialized waterside space / Ecological bases
  • Make tourist attractions by building facilities for leisure and rest at the center of the city, including places to walk and ecological bases
    • Moving roads underground: Move Olympic-daero, Tancheondong-ro, and Tancheonseo-ro underground in order to integrate and use the waterside areas.
    • The waterside areas: The waterside areas around the Hangang River can be used for a multi-purpose location featuring performances, picnicking, and camping, and Tancheon Stream can serve as a rest area allowing for daily leisure at the center of the city.
    • Pedestrian walkways: Build pedestrian walkways encompassing COEX, Hyundai Motors GBC, Tancheon Stream, Jamsil Sports Complex, and the Hangang River
      • Build a symbolic Tancheon Walkway that integrates buildings into a bridge, and use it as a base for cultural tourism.
    • Ecological bases: Preserve and nurture the channel junction of the Hangang River and Tancheon Stream, where various ecosystems exist, as an ecological base.
Private sector-led projects / public sector supporting projects
  • Develop a sustainable urban development plan, with the goal of creating transit-oriented and environment-friendly infrastructure
    • Expand five service routes, including metropolitan railways, and establish a public transportation system that is directly connected to the international airports.
    • Consider the ecology and pedestrian walkways environment, and pursue “LEED-ND” certification.

    ※ LEED-ND: Leadership in Energy and environmental Design – Neighborhood Development

  • Conduct the construction successfully using public infrastructure investment and ideas from the private sector
    • Carry out construction of infrastructure with high public interest using public expenditures.
    • Provide minimum guidelines to allow the private sector to freely propose projects for all sites, including public projects.
Example of development plan by stages
  • First stage [2019~2021]
    • Relocation of Student Gymnasium, demolition of swimming pool
    • Construction of exhibition/convention facility ①
    • Construction of the indoor sports complex
    • Construction of leased facility of hotels and for-profit facilities
    • Maintenance of the Hangang River and Tancheon riverside
  • Second stage [2019~2023]
    • After National Sports Festival (in 2019), demolition of indoor gymnasium and auxiliary stadium
    • Renovation of the main stadium
    • Relocation and construction of the auxiliary stadium
    • Construction of the youth hostel
    • Construction of the marina and related for-profit leased facilities
  • Third stage [2020~2025]
    • Moving Olympic-daero underground and demolition of the baseball park
    • Relocation and construction of the baseball park
    • Construction of exhibition/convention facility ②